Risk Assessments
Technical Risk Assessments
Clients use technical risk assessments to improve the long-term reliability of new or ungraded systems on their rigs. WEST utilizes advanced FMECA (Failure Mode, Effects and Criticality Analysis) and other assessment techniques to deliver a more comprehensive and systematic assessment at the same or lower cost than other techniques being used in the industry.
Reliability Studies
Equipment and systems reliability studies assist clients in eliminating downtime while optimizing their investment in maintenance. These studies utilize statistical analysis, review of maintenance and parts programs and historical information from WEST surveys. Frequently, overall reductions in recommended preventative maintenance tasks and/or frequencies have resulted.
Failure Analyses
Critical and/or frequent failures have caused clients to contract WEST for a more in-depth review of failure with a specific eye on root cause identification. This often results in a multi-pronged solutions approach involving engineering staff, historical field performance and failure experience, and the equipment manufacturer.
WEST pioneered the business of 3rd-party assessments of well control equipment and is still the preeminent leader in this field, with thousands of BOP/well control surveys. WEST is also an industry leader in survey assessments of drilling systems on rigs of all kinds, from ultra-deepwater to land rigs. These assessments cover a wide range of equipment and activities, such as:
Nothing is more frustrating than having new equipment and then finding that it does not work as you envisioned. Highly experienced WEST personnel will oversee, commission and accept new construction. When needed, WEST's engineering expertise may be called upon. Project management services are also available. Working with manufacturers, integrators and shipyards, these WEST personnel ensure that the equipment is fit for your purpose.